Skip to content

To report a serious incident to DEM, as required by Section 85(2) of the Petroleum and Geothermal Energy Act 2000, licensees should contact the serious incident reporting hotline on: (08) 8463 6666. For more information please visit the Compliance and Monitoring webpage |          The Department for Energy and Mining (DEM) will transition its systems from GDA94 to GDA2020 and its associated Map Grid (MGA2020) over the weekend of 10th and 11th August 2019. For more information please visit the DEM Transition to GDA2020 webpage.

Spitfire_2IMG_2138Ensign_Rig_965_drilling_Holdfast2_February_2013QSN3_Pipeline_Construction_October_2011

Leigh Creek Energy In-Situ Gasification

This proposed demonstration plant will involve the establishment of a single gasifier chamber and associated above-ground infrastructure to produce synthesis gas (commonly referred to as syngas) for a short period of time (approximately 2-3 months), to test the syngas composition and process performance to enable consideration of potential commerciality.

Read more

SAPEX Fracture Stimulation Activities in the Arckaringa Basin

SAPEX are proposing to undertake fracture stimulation operations on petroleum wells in the Arckaringa Basin of South Australia.

Read more

Beach Energy Otway Basin Production

Beach Energy Limited (Beach) holds a number of petroleum licences in the onshore Otway Basin in the South East of South Australia. These encompass various assets including the Katnook Gas Plant and associated infrastructure. To allow the production and processing of gas in the South East, an updated petroleum production Environmental Impact Report and Statement of Environmental Objectives is required.

Read more